The wood/glass door from the Fellowship Hall to the parking lot has been re-installed. The interior beams have mostly received a first coat of paint. The smoke alarm system is being wired, along with telephone and data lines.
Insulation was delivered today and the drywall should be delivered on Friday. They will start dry walling on Monday. Somewhere around the 24th or so, we will need to make a concerted effort on interior painting. In the meantime, we need to get two coats of paint on the soffits before we can begin painting the siding. The siding will pre-primed, so that will save one step.