This Sunday, there will be a more stable entrance to the Chapel. The ramp is all on one level, plus it has hand rails. Even this will be temporary because during the coming week they will pour footings and before two weeks is up, we should have new sidewalks.
The bottom picture is the room formerly known as the kitchen. The abatement crew was here on Thursday and Friday to remove the vinyl and mastic in the kitchen, plus vinyl, tile and mastic in the restrooms and back hallway. We will put a new floor covering over the tile in Fellowship Hall, so those tile do not have to be removed.